Project:
Mechanical design of a rack-mounted telecomms system in 19” EP (Equipment Practice)
Supporting an in-house mechanical design team by providing experienced mechanical design resource on a Time & Materials basis. Work involved the design of a fabricated 19″ sub-rack using CREO followed by the generation of manufacturing documentation.
Industry: Datacomms
![](https://www.warleydesign.co.uk/wp-content/uploads/2022/07/Icon-02.png)
Detailed design
![](https://www.warleydesign.co.uk/wp-content/uploads/2022/07/Icon-03.png)
Manufacturing documentation
Project completed: July 2022