Project:
Design capture and enhancement to increase the capacity of a large industrial process oven
Involved the 3D capture of existing installation from a combination of using manufacturer’s original 2D drawings and undertaking a number of site surveys during which time design features were photographed, measured and recorded.
Existing installation was captured in full using SolidWorks, before modelling the new modification concepts.
Industry: Industrial
![](https://www.warleydesign.co.uk/wp-content/uploads/2022/07/Icon-01.png)
Technology & concept development
![](https://www.warleydesign.co.uk/wp-content/uploads/2022/07/Icon-02.png)
Detailed design
Project completed: May-22