Project:
Design, manufacture & delivery of production test equipment
This project was the turn-key provision of test boxes to be used by a client in their production facility. The test boxes were first to be used as a training aid in an organised training event, so on-time delivery was critical. The task entailed:
- – design of the test box
- – production of manufacturing documentation
- – organising production of the parts
- – progress chasing / expediting
- – ensuring on-time delivery to client
Industry: Industrial - Water Utilities
![](https://www.warleydesign.co.uk/wp-content/uploads/2022/07/Icon-02.png)
Detailed design
![](https://www.warleydesign.co.uk/wp-content/uploads/2022/07/Icon-03.png)
Manufacturing documentation
![](https://www.warleydesign.co.uk/wp-content/uploads/2022/07/Icon-06.png)
Sourcing / Supply chain
Project completed: Feb-24